HONGYANG GROUP French Southern Territories Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP French Southern Territories Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

U103-A Filter

U103-A

U103-A Filter

This device is mainly applied in the system of dispenser to remove the solid sedimentation is the oil ,ensuring the cleaning of the oil or like ,and as a result to extend the life span and accuracy of the flow meter. In the system of dispenser ,it is fixed between the oil pump and the flow meter.

Materials:

Body: Body: Aluminum (Spray-Painted)

Seals: Buna-N

Technical Specifications:

Working pressure:0.2Mpa

Filter accuracy:30um

Flow Rate:65L/min

Rating Medium:Gasoline,Kerosene, Diesel

100% Factory Tested.

Package:

Product ID Net Weight Cross Weight Dimension

U103-A 2kg/case of1 2.2kg/case of1 20x13x14cm/case of1

products links

links

technical archives

    is filled oil whenever refuel or stop operating. The inner cubage of hose varies upon basis of hose’s interior pressure owing to different pressure as stop working or refueling. The varied degree correlates with working pressure, material and length of hos fuel dispenser e. Hence, exactitude is affected by above variability. Service life testing In the new national standard GB/T9081-2001 Fuel Dispenser for Vehicle, the testing is called as test for working stability. The purpose is to assess the whole performances, namely, how long key components can be operated without no trouble c fuel dispenser ondition, especially component of flow meter. Testing time is 100 hours. Measuring accuracy fluctuation not exceed ±0.15% stipulated in GB-9081-2001. The above six items of model testing comprehensively assess the fuel dispenser’s performances, mainly examining accuracy of flow meter, vapor separator, hose. As so many fuel dispensers are adapting taxation supervision device that model testing stipulated in regulations includes other nine items supplementary testing of environmental and electromagnetic interference, such as high and low temperature, wet-hot interchange, vibration, source adaptability, in fuel dispenser stantaneous power cut, voltage decline, static discharge, sensibility of radiation electric magnetic flied, sensibility of electric pulse. Only factory passed over the above testings and having obtained production license could manufacture fuel dispenser as large quantity. In summary, fuel dispenser’s measuring management mainly is carried out through model approval and examination and appraisal of every phase. However, as for each technical requirement to fuel dispenser is inspected, supervised and implemented also through model approval and every phase’s examination and appraisal. Article II Appraised condition and apparatus Except for the initial approval carried out in factory, other fuel dispenser�approvals are implemented on spot. Equipment used for preventing sunlight, rainwater and wind should be access so as to ensu

technical specification

    January 2005   CONTROLLER DEVICE APPLICATION   fuel dispenser Page: 3   Document Contents  0 RECORD OF CHANGES .............................................................................................................................................. fuel dispenser ..............4  1 GENERAL .....................................................................................................................................................................................5  1.1 DEFINITIONS AND ABBREVIATIONS ..............................................................................................................................................5  1.2 COMMUNICATIONS .......................................................................................................................................................................5  1.3 fuel dispenser SYSTEM ARCHITECTURE ..............................................................................................................................................................5  2 CONTROLLER DEVICE AND POINT BEHAVIOURAL MODEL......................................................................................6  2.1 CONTROLLER DEVICE AND POINT STATE DIAGRAM ...........................................................................................................7  2.2 STATE EVENT DESCRIPTION .......................................................................................................................................................9   2.2.1 State INOPERATIVE 1 ..............................................................................................................................

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    at stands is an impressive wall, and the gaunt but beautiful remains of churches and mosques randomly scattered across a vast expanse of grassy earth. On a hot day in early summer, with flowers blooming and birds swooping through the ruins, the place is fuel dispenser utterly empty. Ani s location at one of Eurasia s nodal points, where rival civilisations either clash or co-operate, has been both a blessing and a curse. The “silk route�linking Byzantium with China ran through it. But less than a century after it became the Armenian capital in 961, the city began falling vict fuel dispenser im to waves of conquerors, including Seljuk Turks, Georgians and Mongols. In 1319 it was devastated by an earthquake. Even as a ruin, Ani has been a disputed city. In 1921 when most of the site was ceded to Turkey, the Armenians were dismayed. They have since accused the Turks of neglecting the place in a spirit of chauvinism. The Turks retort that Ani s remains have been shaken by blasts from a quarry on the Armenian side of the border. Turkey s authorities insist that they are doing their best to conserve and develop the site. “By restoring Ani, we ll make a contribution to humanity,�says Mehm fuel dispenser et Ufuk Erden, the local governor. “We will start with one church and one mosque, and over time we will include every single monument.�The culture ministry has listed Ani, with an Armenian church on an island in Lake Van, among the sites it is keenest to conserve. For a country that was reluctant, until recently, to accept the cultural heritage of non-Turks, this is a big change. But some scholars say more is needed. “Piecemeal restoration is no substitute for a master plan for Ani as a whole,�argues Stefaan Poortman of the Global Heritage Fund, a California-based conservation group that helps to manage endangered historic sites. And making a master plan for a site straddling two countries is impossible unless they co-operate. Could it happen? In September, some 14 Black Sea countries hope to meet in Istanbul to dicus